Ge Frame 6 Gas Turbine Manual

Ge frame 6 gas turbine manuals

General Electric 7fa Gas Turbine

Since 2004, PSM has been providing gas turbine solutions for Frame 6B hot gas path buckets, nozzles & shrouds and compressor hardware. Improved durability and lower life cycle cost is achieved using PSM’s component and system level product modeling and data evaluation tools, to identify the issues and failure modes in current Frame 6B OEM gas turbine designs.

Read Online Ge Frame 6 Gas Turbine Service Manual GE Frame 6B Core Engine has run 42,973 hours and 311 starts and has recently undergone a Major Inspection, since this inspection the engine has run only a few hours. 115KV-SF6 Gas Insulated Switchgear with 115KV.2nos SEC OHL, 13. Ge Frame 6 Gas Turbine - fapo.undiscuss.it Page 9/25.

  1. Manuals and User Guides for GE LM6000. We have 1 GE LM6000 manual available for free PDF download: Manual GE LM6000 Manual (31 pages).
  2. 2 Used GE Frame 9E Gas Turbine Dual Fuel Engines. 2 Used GE Frame 9E Gas Turbine Dual Fuel Engines -GAS TURBINE GENERAL DATA Gas Turbine Model PG9161 Power Output (Generator Terminals MW 116.4 Efficiency (Referred to Generator Terminals)% 33 Rotor Speed RPM 3000 Direction of Rotation (looking From Gene.

PSM manufactures all gas turbine buckets, nozzles and shroud blocks to be compatible with the latest 2085F firing temperature machines – the Engine Model 6571 – and are also backwards compatible. In normal operation the entire Frame 6B hot gas path has a minimum service interval of 24,000 FFH or 900 FS, which can be increased to 32,000 FFH on a unit by unit basis, with consultation from PSM’s experts.

1st Stage Nozzle

  • Equivalent to OEM
  • Optional NiCoCrAlY & TBC Coatings

1st Stage Buckets

  • Improved Aero blade profile and cooling

2nd Stage Nozzle

  • Equivalent to OEM

2nd Stage Buckets

  • Scalloped tip shroud for improved creep resistance
  • Increased tip shroud contact face area mitigates shingling

3rd Stage Nozzle

  • Equivalent to OEM

3rd Stage Buckets

  • Increased tip shroud contact face area mitigates shingling

LEC III™: Field proven 3-5ppm NOx

and

LEC-NextGen: Highly durable sub 9ppm NOx

Compatible with 6581B, 7121EA, 9171E and older turbine models either as a drop in replacement to the OEM DLN1.0 or as a conversion from standard diffusion frame systems. The system has proven versatility with over 70 installations globally on GE Frame 6B, 7E/EA, 9E and most recently 4 x 7B units. Originally fielded in 2001, the patented LEC III™ fuel air mixing technology produces consistent sub 5ppm NOx and single digit CO.

Introduced in 2015, the LEC-NextGen has been developed from the original LEC-I and LEC III™ systems in response to the global power generations requirements for increased durability throughout an increased load range, while maintaining sub 9ppm NOx and single digit CO throughout pre-mix operation.

Looking for Brochure Downloads?

Ge Frame 6 Gas Turbine Manuals

Find additional information regarding PSM's Products and Services on our Media page, under the Brochure Downloads section.